Field operation – Great Plains 3PYPA Operator Manual User Manual

Page 57

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

53

03/20/2012

Table of Contents

Index

401-647M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 23
and “Field Set-Up Checklists” on page 51.

Null4:

Null4:

Null4:

Null4:

Null4.aac:

Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

First Pass Operation Checklist

Page

1.

Check that steering is engaged

28

2.

Raise planter and line up at start of first
planting row.

24

3.

Set tractor 3-point hitch to “depth control”
operation (and not load control).
Note: If tractor hitch is set for

“load control”, planting depth will
be uneven.

-

4.

Prime meters with seed.
Leave fan running.

48

5.

Unfold marker on next-row side.

49

6.

Engage hydraulic seed drive via seed
monitor. Refer to seed monitor manual.

-

7.

If planter has a fertilizer system integrated
with the DICKEY-john

®

seed monitor, set

the “Fert.Pump” switch on the Clutch
Folding Module to ON.

42

8.

In the CLUTCH cluster of the CFM, set
Master and section switches ON.

46

9.

Pull forward, lower planter, and begin
planting for a short distance.

24

10. Stop. Assess:

• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)

-

11. Make necessary adjustments

56

12. Resume planting.

-

Sharp Field Turns

a

Checklist

a. Monitor manifold pressure during end-of-pass

operations and turns. Adjust operations as needed
to maintain meter pressurization.

Page

1.

Fold marker

49

2.

Raise planter when fold is complete

24

3.

Make turn

4.

Lower planter

24

5.

Unfold marker on next-row side.

49

6.

Resume planting.

Suspending Planting Checklist

Page

1.

Stop tractor

-

2.

Fertilizer pump OFF

-

3.

Fan hydraulic circuit to Float or Neutral

44

4.

Hydraulic drive circuit to Float or Neutral

-

5.

Fold Marker

49

6.

Raise planter

24

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Install lift assist locks

27

3.

Fold planter

25

4.

Lights ON

-

5.

Transport

31

Null4:

Figure 60

Planting

29900

Advertising