Great Plains 1625AHL Operator Manual User Manual

Page 3

Advertising
background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

2014-04-21

Cover

Index

411-020M

©

Copyright 2012, 2014 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,

Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................16
Description of Unit ........................................................16

Intended Usage ........................................................16

Covered Models ...........................................................16
Using This Manual........................................................17

Definitions.................................................................17

Document Family .........................................................17
Owner Assistance ........................................................17
Preparation and Setup ...............................................18
Initial Setup...................................................................18
Pre-Planting Setup .......................................................18
Hitching Tractor to Planter............................................19

Hydraulic Hookup .....................................................19
3-Point Hitch .............................................................19
Hydraulic Hose Hookup............................................20

Raising/Lowering Tongue....................................20

Electrical Hookup......................................................21
Store Main Parking Stand.........................................22

Monitor Setup ...............................................................22

MVT Monitor Setup...................................................22
PM400 Monitor Setup...............................................22

Marker Setup (Option)..................................................23
Operating Instructions...............................................24
Pre-Start Checklist .......................................................24
Frame and Wing Lock Overview ..................................24
Unfolding the Planter....................................................26
Remove/Store Center Lift Locks ..................................28
Raising/Lowering Planter .............................................29

Raising Planter .........................................................29
Lowering Planter ......................................................29
Re-phasing Lift System ............................................29

Folding the Planter .......................................................30

Shut off Fan ..............................................................30
Set Tractor and Tongue ...........................................30
Raise Planter ............................................................30
Install Lock Channels ...............................................31
Activate Fold Solenoid Valves ..................................31
Begin Folding ...........................................................31
Raise Tongue ...........................................................32
Complete Fold ..........................................................32
Lower Tongue ..........................................................32
Re-phasing Fold System ..........................................32

Transporting ................................................................. 33

Transport Weights.................................................... 34

Loading Materials......................................................... 35

For Loading All Materials ......................................... 35
Loading Seed ........................................................... 36

Hopper Operations ............................................... 36
Loading Seed in a Hopper ................................... 36

Loading Liquid Fertilizer (Option) ............................. 38

Quick-Fill Fertilizer Loading.................................. 39
Hatch Fertilizer Loading ....................................... 39

Loading Dry Fertilizer (Option) ................................. 40

Hopper Safety Information ................................... 40
Swing-Down Railing Section ................................ 41
Load Fertilizer ...................................................... 42

Monitor Operation ........................................................ 42
Ground Drive Lock-Up ................................................. 43

Dry Fertilizer Drive Lock Up (Option) ....................... 43
Liquid Fertilizer Drive Lock-Up ................................. 44
Seed Meter Drive Lock-Up....................................... 45

Field Setup Checklist ................................................... 46

Air and Seeding System Overview........................... 49

Air-Pro

®

Meter Operation............................................. 50

Meter Operation ....................................................... 50

Fan Operation .............................................................. 51

Air Systems General Operating Information ............ 52

Fan General Operating Information ..................... 53
Butterfly Valve Operation (all valves): .................. 53
Balancing Wing Pressures ................................... 54
Liquid Fertilizer Planter Fan Adjustment .............. 54
Dry Fertilizer Fan Adjustment............................... 55

Liquid Fertilizer Operation ........................................ 60
Dry Fertilizer Operation ............................................ 60

Marker Operation ......................................................... 61
Field Operation ............................................................ 62
Parking......................................................................... 63
Storage ........................................................................ 64
Adjustments ............................................................... 65
Setting Material Rates.................................................. 66
Marker Adjustments ..................................................... 68

Dual Marker Speed Adjustment ............................... 68
Marker Disk Adjustment ........................................... 68

Row Implement Adjustments ....................................... 69

Frame-Mounted Row Accessories ........................... 69

Frame-Mounted Coulters ..................................... 69

Fertilizer Applicator Adjustments.............................. 69

Advertising
This manual is related to the following products: