Quick-fill fertilizer loading, Hatch fertilizer loading – Great Plains 1625AHL Operator Manual User Manual

Page 43

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

39

2014-04-21

Table of Contents

Index

411-020M

Quick-Fill Fertilizer Loading
If loading via tank top hatch, see “Hatch Fertilizer
Loading
” (r
ight column).

Refer to Figure 45 on page 56
10. Set the quick-fill shutoff valve

) to closed (10a):

a. Handle 90

° to valve: Closed: no inlet flow

b. Handle in-line with valve: Open: Fill or drain tank

11. Set the tank discharge valve

to closed (11a):

a. Handle in-line with valve: Closed: no flow
b. Handle 90

° to valve: Open

This prevents sedimentation in the line, if the
material will not be immediately applied.

The strainer inlet valve

is normally left open, and

closed only for strainer servicing.

12. Connect fertilizer supply to Quick-Fill inlet

.

13. Open supply valve (if any) and check for leaks.

14. Alert observer to monitor tank fill level.

Note: Although the lid is commonly removed to monitor

fill level, it is not necessary to remove it for filling.
The lid is vented, preventing back-pressure at
normal fill and application rates.

15. Start source pump (if any).

16. Open Quick-Fill inlet valve

.

17. When tank reaches desired fill level,

stop source pump (if any),
close source valve (if any) and
close inlet shut-off

.

18. Disconnect supply line at Quick-Fill.

19. Close the tank lid if removed.

Fertilizer loading is complete.

See “Liquid Fertilizer System (Option)” on page 56.
For pump adjustments, see the Seed and Fertilizer Rate
manual (411-020B). For drop line orifice selection and
installation, see Seed Rate manual.

Hatch Fertilizer Loading
If loading materials via Quick-Fill, see “Quick-Fill
Fertilizer Loading
” instr
uctions (left column).

Refer to Figure 45 on page 56
10. Set the quick-fill shutoff valve

to closed (10a):

a. Handle 90

° to valve: Closed: no inlet flow

b. Handle in-line with valve: Open: Fill or drain tank

11. Set the tank discharge valve

to closed (11a):

a. Handle in-line with valve: Closed: no flow
b. Handle 90

° to valve: Open

This prevents sedimentation in the line, if the
material will not be immediately applied.

The strainer inlet valve

is normally left open, and

closed only for strainer servicing.

12. Remove lid on tank, or center section of lid to load.

13. Route supply line into tank.

14. Commence fertilizer flow.

15. When tank reaches desired fill level,

stop source supply.

16. Close any tank lid removed.

Fertilizer loading is complete.

See “Liquid Fertilizer System (Option)” on page 56.
For pump adjustments, see the Seed and Fertilizer Rate
manual (411-020B). For drop line orifice selection and
installation, see Seed Rate manual.

L13

L17

L18

L12

L13

L13

L13

L17

L18

Advertising
This manual is related to the following products: