Great Plains 3S-3000F Predelivery Manual User Manual

Page 13

Advertising
background image

11

Section 1 Assembly

8/9/06

3S-3000 Three-Section Folding Drill 195-144M

Great Plains Mfg., Inc.

Hydraulic Hose Installation

Figure 1-8

15656

15666

mainframe and reroute them through the hose guide cut-
outs (#9) and through the plastic tie downs on the center
box frame. Place all tees (#8) which rest on the center box
frame on the right side of the formed bracket (#10) welded
to the center of the frame. This keeps them out of the
clutch linkage which is left of center. Connect the 3/8" hy-
draulic hose (#11) coming from the back side of the center
pressure control valve to the tee (#12) which branches to
the base ends of the center two opener lift cylinders. Con-
nect the 3/8" hydraulic hose (#13) coming from the bottom
side of the center pressure control valve to the tee (#14)
which branches to the rod ends of the center two opener
lift cylinders. Tighten the plastic tie down straps to keep
the hoses out of the drives.

Advertising
This manual is related to the following products: