Drill assembly components, Pre-assembly checklist, General description – Great Plains 3S-3000F Predelivery Manual User Manual

Page 5

Advertising
background image

3

Section 1 Assembly

8/9/06

3S-3000 Three-Section Folding Drill 195-144M

Great Plains Mfg., Inc.

Section 1

Assembly

Having all the parts and equipment readily at hand will
speed up your assembly task and make the job as safe as
possible.

Drill Assembly Components

Wide Loaded Drills

Drill Assembly (Complete drill less wing
walkboards, press wheel arms, press wheels and reflec-
tor decals)

Press Wheel Arms
(1 Per row for each wing frame opener)

Press Wheels (1 Per row for each wing frame opener)

Wing Walkboards (2)

Red and Amber Reflector Decals

Acre Meter

All fasteners and misc. components are located
in their assembly location

Pre-Assembly Checklist

Check

Reference

All major frame components

This Manual

Fasteners and pins that were shipped with the drill.
NOTE: If a pre-assembled part or fastener is tempo-
rarily removed for assembly reasons, remember where
it goes. Keep the parts separated.

This Manual

Inflate tires to specified air pressure. Tighten wheel
bolts to specified torque.

Oper. Manual

Section 8, pg. 43

Have a minimum of 2 people at hand while assembling drill.

This Manual

Have a fork lift or hoist along with chains and safety
stands that are sized for the job ready for assembly task.

This Manual

NOTE: In the illustrations all related components may
not be shown. This is to help clarify instructions that go
with the illustration.

Standard Legal Width Loads

Tongue and Mainframe Assembly or

Mainframe Assembly less Tongue

Tongue Assembly

Center Box Frame Assembly

Right Hand Wing Box Frame Assembly

Left Hand Wing Box Frame Assembly

Transfer Drive Shaft Assembly

Acre Meter

All fasteners and misc. components are located
in their assembly location

General Description

This manual was written to aid in the assembly and prep-
aration of a new drill that is delivered by Great Plains
Trucking network. The manual includes, assembly instruc-
tions, leveling instructions, and hydraulic bleeding instruc-
tions. It is recommended to bleed and charge all hydraulic
circuits before attempting to make leveling adjustments.
The hydraulics can aid in the leveling and drill preparation
process. Read and understand the “Important Safety In-
formation
” section on pages 1 through 7 of the operators
manual before you start. It is the responsibility of the deal-
er to unload, assemble, and prepare the drill for use.

Tools required

Fork lift, overhead hoist, or loader

General hand tools

Advertising
This manual is related to the following products: