4-28

ADS FlowShark Manual

include issues such as the manhole location in relation to
the pedestal, existing landscape, utilities present, and
excavation costs.

 Notify the local underground utilities locating service

concerning the desired pedestal location and antenna cable
route. Typically, notification must occur 2 to 3 days before
excavation activities are scheduled to begin.

4. Using a post hole digger or shovel, dig a hole at the designated

pedestal location approximately 4 inches deep and slightly
larger than the diameter of the pedestal base to accommodate
the base and the stake.

5. Dig a trench at least 8 inches deep between the hole and the

manhole, tapering down from the pedestal location.

Hole, trench, and manhole

6. Drill a hole at least a ½ inch in diameter in the corbel of the

manhole as close as possible to the bottom of the trench using a
corbel drill.

7. Drive the stake of the pedestal into the ground at the designated

location until approximately 4 inches of the stake remain above
ground level. Be sure to avoid driving the stake in at an angle;
the pedestal should not be tilted once attached to the stake.