ADS Environmental Services FlowShark QR 775002 A4 User Manual

Page 263

Advertising
background image

In-4

ADS FlowShark Manual

MLI, 6-20
Modbus, 9-1
Modbus Slave ID, 9-3
modem selection, 6-21
monitor

activation, 6-25
activation logs, 6-49
boards, 2-4
collecting data, 6-37
communication

landline, 2-6
wireless, 2-6

configuration, 6-3

creating a monitor location, 6-5
creating an installation table,

6-7

editing the pressure device,

6-19

editing the ultrasonic device,

6-14

editing the velocity device, 6-16
selecting devices, 6-11

connecting sensors, 3-45
connectors, 2-13
description, 2-4
GPRS, 2-6, 4-18
inspection, 10-2, 10-3
installation, 7-1

mounting to the manhole rim,

7-7

mounting to the manhole wall,

7-4

installing wireless communication,

4-18

maintenance, 10-2
MLI, 6-20
opening enclosure, 10-6
power

battery packs, 2-15
external source, 2-15

processor board, 2-7
replacing 12-volt battery packs,

10-4

temperature, 6-21

troubleshooting, 10-14
upgrading the firmware, 6-46
viewing diagnostic logs, 6-49
wireless, 2-6

monitor configuration, 6-3

creating a monitor location, 6-5
creating an installation table, 6-7
editing the pressure device, 6-19
editing the ultrasonic device, 6-14
editing the velocity device, 6-16
MLI, 6-20
selecting devices, 6-11

N

network interface box

connecting wires from lightning

protection module, 4-15

inspection, 10-11

O

on-site communication

using the direct connection cable,

4-38

P

pipe conditions, 3-4
pipe table, 6-7
port selection, 6-21
power

12-volt battery packs, 2-15, 10-4
external DC source, 2-15

pressure depth sensor

description and operation, 2-18
editing the device, 6-19
installation, 3-20
mounting sensor to the ring, 3-20
replacing the desiccant in the dryer

tube, 10-10

replacing the dryer tube, 10-9
running diagnostics, 6-28

Advertising