Bio-Rad Bio-Plex System Validation and Calibration Tools User Manual

Page 24

Advertising
background image

Section 10
Procedure for Bio-Plex Manager 2.0
and MCV Plate

10.1 Validation of Optics Alignment

Procedure

1.

Turn on the Bio-Plex array reader, microplate platform, and computer as
specified in the Bio-Plex hardware and Bio-Plex Manager user manuals.
Note: Be sure to calibrate immediately before validation. Use the High RP1
Target value for CAL2 calibration.

2.

Perform start-up procedure as directed.

3.

Calibrate Bio-Plex array reader using CAL1 and CAL2 beads found in the
Bio-Plex calibration kit according to the Bio-Plex Manager software manual.

4.

Remove the optics validation bead set from 4°C storage and vortex each
bottle for 30 sec.

5.

Place 5 drops of optics bead 1 into the first of the 3 optics wells labeled with
"1" on the MCV plate (see Figure 2 below). Leave the 2 remaining wells
labeled with "1" empty.

Fig. 12. MCV plate.

6.

Place 5 drops of optics bead 2 into the first of the 3 optics wells labeled with
2 on the MCV plate. Leave the 2 remaining wells labeled with "2" empty.

7.

Store optics beads at 4°C as soon as possible after use. Protect the beads
from light.

Bio-Plex Manager 2.0 and MCV Plate Instructions

21

4110007c.qxd 02/25/2003 10:12 AM Page 21

Advertising