Section 5 | starting the run in the instrument tab, Select the stainer – Dako Artisan™ Link Pro User Manual
Page 39
Dako Artisan™ Link
|
Basic User Guide
31
Section 5 |
Starting the Run in the Instrument Tab
Once the Artisan™ Link is loaded, you can use the
Instruments tab to start and monitor the run.
When you start the run, the instrument scans the DataMatrix on the slide label. As a result of the
scan, the system changes the workflow status on the Workflow tab, lists the scanned slides on the
Instruments tab, and records the position of the slide location.
To start the run, complete the following tasks:
Manage bulk liquids and waste fluids
Load slides
Load reagents
Print reports
Start the run
Select the Stainer
If you have multiple Dako instruments, you must first select the instrument you want to use.
1. In the
Instruments column on the left side of the screen, click the instrument you want to
use. The graphics for the selected instrument display on the right side of the screen.