Installation, Inspecting the equipment – Dell UPS 10000R User Manual
Page 12
12
|
Installation
Installation
This chapter explains:
S
Equipment inspection
S
Unpacking the cabinet
S
UPS rear panels
S
UPS setup and installation, including the External Battery Module (EBM)
S
Remote Emergency Power-off (REPO) installation
S
Initial startup
NOTE:
Discard or recycle the packaging in a responsible manner, or store it for future use.
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping cartons and packing materials
damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier within 15 days of
receipt of the equipment; 2) Send a copy of the damage claim within 15 days to your service
representative.
NOTE:
Check the battery recharge date on the shipping carton label. If the date has passed, do not use the
UPS. Contact your service representative.
3