Resetting peak load and kwh, Configure and control outlet groups, Outlet group terminology – Dell Managed PDU LED User Manual

Page 103: User’s guide

Advertising
background image

USER’S GUIDE

Ma

na

ge

d R

a

ck

PD

U

98

Resetting Peak Load and kWh

Path: Device Manager > Device Load

1. Click the

Device Manager

tab, then

device load

from the

Load Management

menu.

2. Click the

Peak Load

and

Kilowatt-Hours

check boxes as desired.

3. Click

Apply

.

Configure and Control Outlet Groups

Outlet group terminology

An outlet group consists of outlets that are logically linked together on the same Rack
PDU. Outlets that are in an outlet group turn on, turn off, and reboot in a synchronized
manner:
• A local outlet group consists of two or more outlets on a Rack PDU. Only the outlets

in that group are synchronized.

• A global outlet group consists of one or more outlets on a Rack PDU. One outlet is

configured as a global outlet, which logically links the outlet group to outlet groups
on up to three other Rack PDUs. All outlets in the linked global outlet groups are
synchronized.
– For global outlet groups, the initiator outlet group is the group that issued the

action.

– For global outlet groups, a follower outlet group is any other outlet group that is

synchronized with the initiator outlet group.