System requirements for outlet groups

To set up and use synchronized outlet control groups:
• You need a 10/100Base-T TCP/IP network, with an Ethernet hub or switch that has a

power source not shared by the computers or other devices being synchronized.

• If outlet groups are to be synchronized across multiple Rack PDUs, those Rack

PDUs must meet the following requirements:
– They must be on the same subnet.
– They must use firmware that has the same version number for both the Operating

System (AOS) module and the application module.

• You need a computer that can initiate synchronized control operations through the

Web interface or command line interface of the Rack PDUs or through SNMP.

• Outlet groups you synchronize must have the same Multicast IP address. Make sure

each Ethernet switch that connects Rack PDUs allows Multicast network traffic for
that Multicast IP address.