Steel-channel-reinf – Oldcastle BuildingEnvelope Reliance StormMax User Manual

Page 11

Advertising
background image

8






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

1.5 a. Insert RS-25 reinforcement steel into HW-500 jamb or mullion

(Steel Height = mullion Height Minus 6")

b.Prior to HW-183-01 shear block attachment insert HW-200-01 anchor sleeves at

HW-500 vertical mullion ends and match drill .191 dia. hole.

c. Attach HW-183-01 shear block to HW-500 vertical mullion with FS-9 fastener

d. Attach RS-25 reinforcement steel to HW-500 Jamb or mullion with (2) FS-322

fasteners to be located within the intermediate horizontal shear block as show in FIGURE 1.5a

e. Install FG-5185 interior spacer gasket cut to 2" from ends and 2" gaps at

horizontal to allow for WW-352 zone plugs.

f. Install and seal HW-325 end caps to top and bottom of HW-500 vertical mullion

screw boss with (2) FS-320 #10 x 1/2" drive screw.

HW-200-01 Anchor Sleeve

(for design pressures above 70 psf)

HW-500 Intermediate vertical mullion

HW-183-01 shear block

Drill #25 - .1495" pilot hole

install (2) FS-322 Fasteners

HW-338 for Jambs

and HW-325 for mullions

Seal and tool sealant on end caps

Steel Height = mullion Height Minus 6"

RS-25 Reinforcement Steel

(4) FS-9 Fasteners

FIGURE 1.5

FIGURE 1.5a

(2) FS-320 Drive Screw

ALTERNATIVE REINFORCEMENT STEEL CHANNEL

Advertising