Stacked-horiz-install – Oldcastle BuildingEnvelope Reliance StormMax User Manual

Page 35

Advertising
background image

32






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

STACKED HORIZONTAL INSTALLATION

HW-500 Jamb

HW-184 Stack Shear Block

HW-194-01 Splice Sleeve

Apply Bond Breaker Tape

along face of splice

5.0 a. Apply bond breaker tape to HW-194-01 splice

b. Insert HW-194-01 splice into bottom half of HW-500 mullion.

c. Attach splice to bottom half of HW-500 mullion with FS-8 fastener (2) per side.

d. Insert top half of HW-500 mullion on to splice. Insert anchors on both ends and install into opening.

Corner mullion has similar assembly.

FS-8 Fastener

HW-184 Stack Shear Block

FIGURE 5.0

HW-338 End Cap

HW-338 End Cap

Advertising