21






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

ISOLATOR GASKET INSTALLATION

3.0 a. Install face gaskets into all pressure plates. Crowd all gaskets into members to avoid gaps caused by

relaxation of gasket material.

b. Install thermal spacer into groove on face of mullion tongues. Cut short 1/8" from each end of the

mullion. See

FIGURE 3.0

c. Position setting blocks at correct location (two per lite). Refer to approved shop drawings. Lubricating

the top of setting blocks will help insure proper setting of glass. Note: Consult glass manufacturer

for correct setting block location and length for glass sizes.

1/8"

1/8"

1/8"

GP-107 Thermal isolator

GP-107 Thermal isolator

(not required at SSG mullion)

WW-352 Zone Plug

FIGURE 3.0

Thermal Isolator Installation