90-osc-assembly-ssg – Oldcastle BuildingEnvelope Reliance StormMax User Manual

Page 41

Advertising
background image

38






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

6.2 a. Step 1 - Install glazing and temp in using WW-333-01 temporary glazing retainer and HW-132-01

qdaptor. (spaced at 36") Apply interior bead of structural silicone in glazing pocket. Allow for a

full cure of structural silicone before removing temporary retainer.

b. Step 2 - Remove temporary retainer and apply a bead of silicone in vertical race. Install F-64 SSG corner

tube. Install and seal HW-214 zone plugs at horizontal members. Apply painter's tape to the

edge of glazing and F-64 tube and apply silicone sealant. Remove tape once silicone skins over.

c. Step 3 - Install WW-162 pressure plates and WW-110 face cap at horizontal members. Dimensions are

to be in accordance with approved shop drawings.

WW-162

Pressure Plate

WW-110 Face Cover

(D.L.O. minus 1/16")

45 degree mitered corner

HW-214 Zone Plug

(typ. both sides)

WW-333-01 Temporary

Glazing Retainer

FS-325 Fastener (1)

per retainer

HW-132-01

Temporary Adaptor

Structural Silicone

Sealant

OS 90 DEGREE SSG CORNER ASSEMBLY







F-64 Tube

Silicone Sealant Bedding

Silicone Sealant

with Backer Rod

Advertising