90-osc-assembly-ssg – Oldcastle BuildingEnvelope Reliance StormMax User Manual
Page 41

38
R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L
6.2 a. Step 1 - Install glazing and temp in using WW-333-01 temporary glazing retainer and HW-132-01
qdaptor. (spaced at 36") Apply interior bead of structural silicone in glazing pocket. Allow for a
full cure of structural silicone before removing temporary retainer.
b. Step 2 - Remove temporary retainer and apply a bead of silicone in vertical race. Install F-64 SSG corner
tube. Install and seal HW-214 zone plugs at horizontal members. Apply painter's tape to the
edge of glazing and F-64 tube and apply silicone sealant. Remove tape once silicone skins over.
c. Step 3 - Install WW-162 pressure plates and WW-110 face cap at horizontal members. Dimensions are
to be in accordance with approved shop drawings.
WW-162
Pressure Plate
WW-110 Face Cover
(D.L.O. minus 1/16")
45 degree mitered corner
HW-214 Zone Plug
(typ. both sides)
WW-333-01 Temporary
Glazing Retainer
FS-325 Fastener (1)
per retainer
HW-132-01
Temporary Adaptor
Structural Silicone
Sealant
OS 90 DEGREE SSG CORNER ASSEMBLY
F-64 Tube
Silicone Sealant Bedding
Silicone Sealant
with Backer Rod