Horizontal-fabrication – Oldcastle BuildingEnvelope Reliance StormMax User Manual

Page 14

Advertising
background image

11






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

1.8 a. Cut all horizontal members as follows:

-HW-500 horizontal to D.L.O.

-HW-501 head, HW-502 Sill, HW-532 roll over horizontal, HW-533 roll

under horizontal, WW-237 filler to D.L.O. minus 1/16"

b. Drill (2) #11 - .191" holes and counter sink locate 3/4" from each end at "V" grooves

c. Slide FG-5185 spacer gasket into reglet on all horizontal members cut to D.L.O. size as

shown in

FIGURE 1.8b.

D.L.O.

HW-500 horizontal mullion, (HW-501 head,

HW-532 roll over horizontal, HW-533 roll

under horizontal WW-237 filler and

HW-502 sill will have the same fabrication

except D.L.O minus 1/16")

3/4"

Drill (2) #11 - .191" holes and

counter sink. Locate .75" from

each end of member.

D.L.O.

FG-5185

Spacer Gasket

FIGURE 1.8a

FIGURE 1.8b

HORIZONTAL MEMBER FABRICATION

Advertising