Mid-pt-anchor-at-mullion – Oldcastle BuildingEnvelope Reliance StormMax User Manual

Page 34

Advertising
background image

31






R E L I A N C E S T O R M M A X I N S T A L L A T I O N M A N U A L

4.1 a. Install plumb and align vertical mullion. Drill appropriate sized holes for anchor bolts as shown on

approved shop drawings.

b. Insert a (minimum) 1/16" Koralath slip pad between the anchor and the tap plate prior to inserting

fasteners.

c. Insert anchor bolts through the mullion and install lock washers and nuts as required.

NOTE: Details shown are to used as a guide only. See approved shop drawings for actual conditions.

MID POINT ANCHOR AT MULLION

FIGURE 4.1

Advertising