General information – Oldcastle BuildingEnvelope CW-250 User Manual

Page 4

Advertising
background image

4

February 2012

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

GENERAL INFORMATION

The CW-250 curtain wall system is intended to be used by glazing professionals with appropriate

experience. Subcontractors without this experience should employ a qualified person to provide field

instruction and project management.

Oldcastle BuildingEnvelope

does not control the application nor selection of its product configurations, sealant

or glazing material and assumes no responsibility thereof. It is the responsibility of the owner, architect and installer to

make these selections in strict compliance with applicable laws and building codes.

Variations on the details shown are inevitable and are not the responsibility of

Oldcastle BuildingEnvelope

when

drawn by others.

Oldcastle BuildingEnvelope

strongly encourages its customers to use its Engineering department

for calculations and shop drawings.

PROTECTION AND STORAGE:

Handle the material carefully. Do not drop from the truck. Stack with adequate separation so that the

material will not rub together. Store material off the ground. Protect against the elements and other

construction hazards by using a well

-

ventilated covering. Remove material from package if it is wet or is

located in a damp area. Please also reference AAMA publication “Care and Handling of Architectural

Aluminum From Shop to Site.”

CHECK MATERIAL:

Check glass dimensions for thickness. Some glass manufacturers are very liberal with their quality control

standards.

Oldcastle BuildingEnvelope

cannot be held responsible for gaskets that are not water tight due to

extreme glazing tolerances. However, given advance notice,

Oldcastle BuildingEnvelope

will attempt

to provide an alternate gasket for a nominal charge.

Check all material upon arrival for quality and to assure against shipping damage. Any visible damage must

be noted on the freight bill at the time of receipt. If a claim is required, then receiving party must process a

claim with the freight company.

Completely check construction that will receive your material against contract documents. Notify the

general contractor by letter of any discrepancies before proceeding with the work. Failure to do so

constitutes acceptance

of work by other trades.

Check shop drawings and installation instructions to become familiar with the project. The shop drawings

take precedence and include specific details for the project. The installation instructions are of a general

nature and cover the most common conditions. Due to varying job conditions; all sealant used should be

approved by the sealant manufacturer to insure they will function for conditions shown on instructions and

shop drawings. They must be compatible with all surfaces in which adhesion is required, including other

sealant surfaces. Use primers where directed by manufacturer of sealant. Be sure to properly store sealant at

the recommended temperatures and check sealant for remainder of shelf life before using.

C W - 2 5 0 C U R T A I N W A L L I N S T A L L A T I O N M A N U A L