Mull-reinforcing-details, Mullion reinforcing detail – Oldcastle BuildingEnvelope CW-250 User Manual

Page 67

Advertising
background image

MULLION REINFORCING DETAIL

67

February 2012

C W - 2 5 0 C U R T A I N W A L L I N S T A L L A T I O N M A N U A L

Web Address: www.oldcastlebe.com

Phone: 1-866-OLDCASTLE (653-2278)

3/8"

5/16"

SEE NOTE#5

FS-27 TYP.

(#12 X 1/2" PPHSTS)

NOTE: INSTALL FASTENERS

AFTER REINF. STEEL IS

IN PLACE INSIDE MULL.

(SEE NOTE #3)

CW250-FP-1

SHEAR BLOCK

(SEE NOTE #1)

CW-21 MULLION

(CW-1 & CW-7 SIM.)

CW250-PP-15

CW250-PP-16

CW250-PP-17

NOTES:

1) SEE SHEET 15 FOR TYPICAL DETAILS AT OPEN-BACK

INTERMEDIATE HORIZONTALS WITH CW250-FP-3 SHEARBLOCKS.

2) TO AVOID INTERFERENCE WITH SHEARBLOCK FASTENERS, INSTALL

ALL STEEL REINFORCING CHANNELS PRIOR TO SECURING SHEAR

BLOCKS TO MULLIONS.

3) THE USE OF REINFORCING CHANNELS REQUIRES THAT THE

CW250-FP-1&2 SHEARBLOCKS BE SECURED WITH FS-27 FASTENERS

IN LIEU OF THE FS-43 FASTENERS TYPICALLY USED WHEN THE

MULLION IS NOT REINFORCED. (SEE SHEET 10 FOR THE TYPICAL

UNREINFORCED CONDITION)

4) CW250-PP-15 REINFORCING CHANNEL MAY BE USED ALONE, OR IN

COMBINATION WITH CW250-PP-16 OR CW250-PP-17
5) SEE SHEETS 10 & 11 FOR FABRICATION OF MULLION AND SHEET

68 FOR LOCATION OF BOLT FOR ATTACHMENT OF REINFORCING CHANNELS.

INTERMEDIATE HORIZONTAL SECTION

Advertising