Ssg-mull-pressplt-bridge-ins, Pressure plate installation at bridge – Oldcastle BuildingEnvelope CW-250 User Manual

Page 50

Advertising
background image

PRESSURE PLATE INSTALLATION AT BRIDGE

50

February 2012

C W - 2 5 0 C U R T A I N W A L L I N S T A L L A T I O N M A N U A L

Web Address: www.oldcastlebe.com

Phone: 1-866-OLDCASTLE (653-2278)

MARK LOCATION OF DIVERTER

BRIDGE CENTERLINE BY

TEMPORARILY ALIGNING

PRESSURE PLATE, CUT LOWER

PRESSURE PLATE GASKET AT

BRIDGE LOCATION AND SPREAD

GASKETS TO ALLOW 3/4" GAP.

INSTALL PRESSURE PLATE

ONTO HORIZONTAL AND ALLOW

GAP TO CLOSE AS SHOWN

IN DETAIL ON PAGE 53.

3/4"

IF PRE-PUNCHED SLOT

FALLS WITHIN 2" OF

CENTERLINE OF MULL.

SEAL SLOT WITH

SILICONE AND DRILL

ADDITIONAL 7/32" HOLE AT

2" OFF CENTERLINE

OF MULLION.

INSTALL PRESSURE PLATE

WITH GAP IN LOWER GASKET.

FILL GAPS WITH SILICONE

BETWEEN ENDS OF GASKET

AND WEEP LEG OF DIVERTER.

NOTE:

WHEN INSTALLING PRESSURE

PLATE FASTENERS, THEY SHOULD

BE WITHIN 2" TO 4" FROM

THE CENTERLINE OF MULLION.

ADDITIONAL 7/32" HOLES SHOULD

BE ADDED IF STANDARD SLOTS

ARE NOT WITHIN THIS AREA.

2"

MIN.

MIN.

2"

Advertising