GENERAL INSTALLATION

NOTE:

1) CLEAN FACE OF MULLION AND

HORIZONTALS WITH ISOPROPYL

ALCOHOL PRIOR TO INSTALLATION

OF GLAZING GASKETS TO REMOVE

ALL DIRT AND CUTTING OILS.

2) PROTECTIVE LINER TO BE LEFT

ON GLAZING GASKETS UNTIL GLASS

IS INSTALLED.

3) IT IS RECOMMENDED THAT THE INTERIOR

GLAZING GASKET BE PLACED

JUST PRIOR TO INSTALLATION OF THE GLASS,

SINCE LINER WILL ADHERE TO GASKET IF

ALLOWED TO DRY AFTER BECOMING WET.

4) IF DIRTY OR DUSTY FACE OF GASKET

SHOULD BE CLEANED WITH 50/50 SOLUTION

OF ISOPROPYL ALCHOHOL AND WATER

PRIOR TO GLAZING.

5) PROPER SEALING OF GASKET CORNERS

IS CRITICAL TO SYSTEM PERFORMANCE.

THIS PROCEDURE SHOULD BE PERFORMED

AT THE TIME OF INSTALLATION OF GLASS.

SEE DETAILS BELOW.

DETAIL SHOWN BELOW

PUSH VERTICAL

GASKET INTO PLACE

APPLY SEALANT TO END OF VERTICAL

CUT OFF GASKET

APPROX. 1/4” OVERLAP

TRIM SIDE OF

HORIZONTAL GASKET FLUSH

WITH VERTICAL GASKET

NOTE: DO NOT ENTIRELY REMOVE PROTECTIVE

LINER UNTIL READY TO GLAZE.

CW250-FP-5