MK Diamond MK-101-24 User Manual

Page 18

Advertising
background image

18

(B)

Align Cutting Head rear Pivot

Hole to the Post Pivot Shaft

and slide onto shaft.

NOTE: If the cutting head is installed, go to the next step.

(A)

Ensure Cutting Head Stop is in

upward position.

(C)

Install the Cutting Head onto the

Post Pivot Shaft and install the

Adjusting Knob.

For maximum cutting length,

the Cutting Head should be in

the front pivot hole and the Post

should be in the rear post

retaining hole.

NOTE: For small tiles (6" tile or smaller) the Cutting Head should

be in the rear pivot hole and the Post should be in the forward post

retaining hole. For large tiles and maximum cutting length, the Cut-

ting Head should be in the front pivot hole and the Post should be

in the rear post retaining hole.

NOTE: Move Cutting Head Stop in upward position when using

rear pivot hole and in the down position when using front pivot

hole, refer to page 24.

Cutting Head Installation
Follow the assembly instructions to prepare your MK-101-24 for operation.

MK-101-24

ASSEMBLY

CAUTION

The cutting head is heavy. Care must be used when installing it.

Advertising