On" "off – Carrier 19XR,XRV Hermetic Centrifugal Liquid Chillers User Manual

Page 112

Advertising
background image

112

Fig. 53 — Benshaw, Inc. Solid-State Unit Mounted Starter Wiring Schematic (Low Voltage) (cont)

AUX

Auxiliary

BR

Bridge Rectifier

CB

Circuit Breaker

COND

Condenser

CPU

Central Processing Unit

CVC/
ICVC

Chiller Visual Controller

CT

Current Transformer

EVAP

Evaporator

FU

Fuse

GND

Ground

L

Main Supply Power

LL

Control Power Supply

M

Contactor

O/L

Overload Reset

PFCC

Power Factor
Correction Capacitor

RLA

Rated Load Amps

SCR

Silicone Controller Rectifier

ST

Shunt Trip

TB

Terminal Block

Wire Node Symbol
may have terminal block

Benshaw supplied
terminal block

Terminal Strip

Power Connection

PC Board Terminals

Twisted Pair

Twisted Shielded Pair

Shield Wire

Field Wiring

LEGEND

NOTES:

LED status with power applied and prior to run command.

Transformer T1 primary fuses FU1/FU2 value dependent on system voltage and model, per Chart 1.

Transformer connections per transformer nameplate connection diagram.

MOVs are used on power stack assemblies for system voltages of 200 through 460 vac (as shown).

Resistor/capacitor networks (DVDTs) are used on power stack assemblies in place of MOVs for a system
voltage of 575 vac (not shown).

K3 relay shown in deenergized state. K3 contact will close when power is supplied. K3 contact will open

on stop command or system fault.

CT1-CT3 are sized per Chart 2.

Optional.

1

"ON"

"OFF"

2

3

4

5

6

Advertising