Ski-pro components, continued – Leica Geosystems SKI-Pro User Manual

Page 16

Advertising
background image

An Overview of SKI-Pro

16

Getting Started with SKI-Pro-2.5en

Coordinate Set Management

The Coordinate Set Management manages Coordinate
Sets that are stored in the SKI-Pro database.

A Coordinate Set is a list of point coordinates that are
stored independently from Projects. A Coordinate System
may be assigned to a Coordinate Set, allowing you to
switch between Cartesian, Geodetic and Grid coordinates.

Points can be added either manually, by importing via
ASCII file or by dragging from an existing Project.

A Coordinate Set can either hold WGS84 or
Local Coordinates but does not allow to switch
between them.

Coordinate System Management

A coordinate system provides the information necessary
to convert coordinates to different representations (Carte-
sian, Geodetic or Grid) and to transform coordinates
between the WGS84 and the Local System. A Coordinate
System may be attached to a Coordinate Set or to a
Project.

Within SKI-Pro the user can work in the global system
(WGS84) or in a local coordinate system. The local
coordinate system may be a geodetically defined system
or it may be a simple grid system with neither an ellipsoid
nor a projection associated with it.

The Coordinate System Management is linked to a
database that stores the parameters. This database is
independent from the project database.

SKI-Pro components, continued

Advertising