Mounting the junction box, Mounting location, Junction box installation – Kistler-Morse KM L-Cell Bolt-On User Manual

Page 21

Advertising
background image

Chapter 3. L-Cell Installation on Vertical Legs

3-7

Mounting the Junction Box

Figure 3-14. Junction
Box Mounting

Outside Mounting Holes for
Flat Surfaces (4 places)

CAUTION

Do not install junction boxes
in the rain.
Moisture in the
junction box will cause
corrosion and system errors.

Note

Junction box mounting
hardware is not supplied
by KM. KM recommends
#8-32 socket head cap
screws and flat washers.
The instructions below
reflect this recommenda-
tion.

Figure 3-15. Possible Junction Box Mounting Locations

L-Cell

Drip Loop

Junction
Box

Support
Leg

Support Leg

Junction
Box

Brace

Drip
Loop

L-Cell

Brace

Mounting Location

Each junction box can be wired to a maximum of four L-Cells:

L-Cells — one junction box can be wired to L-Cells from two support
legs (two L-Cells on each support leg) if the legs are sufficiently close
to each other to allow the L-Cell cables to reach.

See Figure 3-15. Locate the junction box on the support leg web or on a
brace. Vertically, locate junction boxes at a convenient height, approxi-
mately 4’ (1.2m) from the ground. The exact location of the junction box is
not critical, but ensure you have sufficient cable length and that a drip loop
will be formed by the L-Cell cables when wired to the junction box.

Junction Box Installation

1.

Remove the junction box cover.

2.

See Figure 3-14. Hold the junction box at the previously marked
mounting location. Mark the mounting holes. Mark the four outside
mounting holes (mounting on a flat surface), such as an I-Beam.

3.

Drill and tap the mounting holes with a #29 drill bit and #8-32 tap.

4.

Mount the junction box with #8-32 socket head cap screws and flat
washers. Tighten the screws until snug. Replace the junction box cover
and screws if not ready to begin wiring, to ensure no moisture enters
the junction box.