Chapter 4. L-Cell Installation on Horizontal Beams

4-4

Figure 4-7. Placement of Four L-Cells on a Beam

Column

(or beam)

Supporting

Instrumented

Beam

(typical)

Load Point

from Vessel

L

Minimum of 18” (457mm)

or beam height

1

/

2

L

1

/

2

L

L

Minimum of 18” (457mm)

or beam height

Figure 4-6. Placement of single L-Cell Set to Left of Load Point

Column

(or beam)

Supporting

Instrumented

Beam

Load Point from

Vessel or End of

Diagonal Beam

L = Distance from Load Point to Column or Beam Support
Minimum of 18” (457mm) or
beam height

1

/

2

L

Top of L-Cell
Points Toward
Load Point

Horizontal or
Diagonal Beam

A

B

IV. Single L-Cell: One L-Cell mounted on the web. It can be located on either side of
the web and either side of the load point. It should be mounted equidistant between the
load and the support. This arrangement yields the lowest accuracy performance.

V. Four L-Cells: Four L-Cells mounted back-to-back on the web. One pair mounted
back-to-back to the right of the load point and one pair mounted back-to-back to the
left of the load point. The pairs are mounted equidistant between the load and the
support. This arrangement provides a degree of accuracy improvement over a two
L-Cell arrangement.