Aerco protonode gateway – AERCO ProtoNode Gateway Rev 3 (with external LEDs) User Manual

Page 12

Advertising
background image

AERCO ProtoNode Gateway

User Manual

Page 12 of 126

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0080_0H

11/06/2014

Ph.: 800-526-0288

GF-129

2.4.5 S0–S3 Bank DIP Switches to Select and Load Device Configuration Files

The “S” Bank of DIP switches (S0 - S3) is used to select and load a configuration file from a
group of pretested/preloaded configuration files, which are stored in the ProtoNode RER
FPC-N34 (BACnet MS/TP, BACnet/IP, Modbus TCP, Metasys N2) and the ProtoNode LER
FPC-N35 (LonWorks).

Figure 2-4: S0-S3 DIP Switch Locations

2.4.5.1 ProtoNode RER S0 to S3 (and A1& A3) DIP Switch Settings

The “A1” and “A3” switches listed in the chart below refer to the additional Mini DIP switches,
NOT the “A” Bank DIP switches (A0 – A7) that are accessible with the cover on. To access
the Mini DIP switches you must remove the cover, as shown in Figure 2-5.

Except for those listed below, all other Mini DIP switches are in the

Off

position.

TABLE 2-4: ProtoNode RER S0 to S3 (and A1*) DIP Switch Settings

S0 S1 S2 S3 A1

Profile

Off

Off

Off

Off

Off

BACnet/IP/BACnet MS/TP, 1 ACS/BMS II, 4 C-More Controlled Boilers

ON

Off

Off

Off

Off

BACnet/IP/BACnet MS/TP, 1 ACS/BMS II, 8 C-More Controlled Boilers

Off

ON

Off

Off

Off

BACnet/IP/BACnet MS/TP, 1 ACS/BMS II, 12 C-More Controlled Boilers

ON ON

Off

Off

Off

BACnet/IP/BACnet MS/TP, 1 ACS/BMS II, 4 Modulex Boilers With BCMs

Off

Off

ON

Off

Off

BACnet/IP/BACnet MS/TP, 4 ECS/SP Systems

ON

Off

ON

Off

Off

BACnet/IP/BACnet MS/TP, 12 C-More, 6 ECS/SP, 4 Modulex and 2 ACS/BMS II

Off

ON ON

Off

Off

Metasys N2, 1 ACS/BMS II, 4 C-More Controlled Boilers

ON ON ON

Off

Off

Metasys N2, 1 ACS/BMS II, 8 C-More Controlled Boilers

Off

Off

Off

ON

Off

Metasys N2, 1 ACS/BMS II CS, 12 C-More Controlled Boilers

ON

Off

Off

ON

Off

Metasys N2, 1 ACS/BMS II, 4 Modulex Boilers with BCMs

Off

ON

Off

ON

Off

Metasys N2, 4 ECS/SP Systems

ON ON

Off

ON

Off

Metasys N2, 12 C-More, 6 ECS/SP, 4 Modulex and 2 ACS/BMS II

Off

Off

ON ON

Off

Modbus TCP, 1 ACS/BMS II, 4 C-More Controlled Boilers

ON

Off

ON ON

Off

Modbus TCP, 1 ACS/BMS II, 8 C-More Controlled Boilers

Off

ON ON ON

Off

Modbus TCP, 1 ACS/BMS II, 12 C-More Controlled Boilers

ON

ON ON ON

Off

Modbus TCP, 1 ACS/BMS II, 4 Modulex Boilers With BCMs

Off

Off

Off

Off

ON

Modbus TCP, 4 ECS/SP Systems

ON

Off

Off

Off

ON

Modbus TCP, 12 C-More, 6 ECS/SP, 4 Modulex and 2 ACS/BMS II

S0 S1 S2 S3 A1 A3

Profile

ON

Off

Off

Off

Off

ON

Slave/Slave Device (SSD) Modbus – for WHM and BST systems

Off

ON

Off

Off

Off

ON

Slave/Slave Device (SSD) Bacnet – for WHM and BST systems

ON

ON

Off

Off

Off

ON

Slave/Slave Device (SSD) N2 – for WHM and BST systems

S0 – S3 DIP

Switches

S Bank DIP

Switch

Location

A Bank DIP

Switch

Location

Mini DIP

Switches

Located

Under
Cover

S0 S1 S2 S3

Advertising