Suggested piping diagrams are shown in Figures

12 through 16. These diagrams are meant only as

guides. Components required by local codes must be

properly installed.
The NeoTherm LC’s efficiency is higher with

lower return water temperatures. Therefore, to

get the best low return temperature with multiple

boilers, pipe as shown in Figures 15 and 16.

6A.2 NTH Cold Water Make-Up

1. Connect the cold water supply to the inlet

connection of an automatic fill valve.

2. Install a suitable back flow preventer between

the automatic fill valve and the cold water

supply.

3. Install shut off valves where required.
In some installations, a hot water heating boiler is

connected to heating coils located in an air handling

appliance where the coils may be exposed to

refrigerated air circulation. In these cases, the boiler

piping system must be equipped with flow control

valves or other automatic means to prevent gravity

circulation of the boiler water during the cooling

cycle.
A boiler installed above radiation level, or as

required by the authority having jurisdiction,

must be provided with a low water cutoff device

either as a part of the boiler or at the time of boiler

installation.

NTH

PIPE SIZE,

NTV

PIPE SIZE,

SIZE INCHES

SIZE INCHES

1000 2

1000 2

1700

2.5

1700

2.5

Table 9 - Water Connection Pipe Sizes

Section 6 -

WATER CONNECTIONS

Section 6 is divided into TWO parts.

Section 6A covers NTH units designed

for hydronic heating. Many installations

include indirect domestic hot water.

Section 6B covers NTV models, which are

designed exclusively for “volume water”

domestic hot water applications. Refer

to the proper section for instructions on

installing and piping your product. Refer

to Table 9 for the connection pipe sizes

required.

Section 6A - NTH Systems

6A.1 NTH System Piping:

Hot Supply Connections

Note -This appliance must be installed in a closed

pressure system with a minimum of 12 psi (82.7

kPa) static pressure at the boiler.

The hot water piping should be supported by suitable

hangers or floor stands. Do not support the piping

with this appliance. The hangers used should allow

for expansion and contraction of copper pipe. Rigid

hangers may transmit noise through the system

resulting from the piping sliding in the hangers. We

recommend that padding be used when rigid hangers

are installed. Maintain 1” (2.5 cm) clearance to

combustibles for all hot water pipes.
Pipe the discharge of the relief valve (full size) to a

drain or in a manner to prevent injury in the event

of pressure relief. Install an air purger, an air vent,

a diaphragm-type expansion tank, a hydronic flow

check in the system supply loop, and any other

devices required by local codes. The minimum fill

pressure must be 12 psig (82.7 kPa). Install shutoff

valves where required by code.