LAARS NeoTherm LC NTV1700 - Install and Operating Manual User Manual

Page 72

Advertising
background image

LAARS Heating Systems

Page 68

About the “Time of Day” Function
If the “time of day” function is enabled, the control

system can be set to maintain different temperatures

for central heat and domestic hot water (other than

the normal setpoints) in the system at certain times

of the day. Normally this function is used to switch

to lower temperatures at night, when the central

heating or domestic hot water demand is reduced.

When the controller acting as the Lead/Lag Master

receives a time of day input, the controller shifts

to the special setpoints entered for central heat and

domestic hot water.
The input for the Time of Day function must be

wired to pins 2 and 3 on connector J10.

Fig. 90 – Connections for “Time of Day” Function

Job J - Install the System Sensor and

Adjust the Setpoint

(This is a Lead/Lag function – do this once for the whole Lead/
Lag system. Make the connections to the controller set up as the
Lead/Lag Master – usually the Primary controller on Boiler 1.)

1. Install the System sensor at the location shown

in Fig. 91. Connect the System sensor to the

System terminals on the controller acting as

the Lead/Lag Master (usually the Primary

controller on Boiler 1.) Use terminals 3 and 4

on TB6.

2. Adjust the Lead/Lag Central Heat Setpoint

to the desired temperature to be used by the

system.

How to get there – Adjust CH Setpoint
Home Page <Press View Lead Lag button> Lead Lag

Screen <Press Lead Lag Master button> Lead Lag
Screen <Press Configure button> Lead Lag Master
Configuration Screen

Line 2 = CH Setpoint

Fig. 91 – Mounting Location for System Sensor

Job K - Set the Lead Lag Outdoor Reset and

Warm Weather Shutdown

(This is a Lead/Lag function – do this once for the whole Lead/
Lag system. Use the controller set up as the Lead/Lag Master –
usually the Primary controller on Boiler 1.)

For more information on the outdoor reset function,

see the explanation which follows.

1. Install the outdoor air temperature sensor and

make the connections to the outdoor air sensor

terminals on the controller acting as the Lead/

Lag Master (usually the Primary controller on

Boiler 1.) Use terminals 1 and 2 on TB7.

Table 16 – Base Load Settings

Number

of boilers

Installed

Base load min.

1

65%

2

50%

3

30%

4

30%

Pins 2 and 3 on

connector J10

Advertising