LAARS NeoTherm LC NTV1700 - Install and Operating Manual User Manual

Page 55

Advertising
background image

NeoTherm LC Boilers and Water Heaters

Page 51

System 7 –

Single boiler, System control

Job I

Set the parameters used by the Lead/Lag system

Job L

Building automation or multiple boiler control thermostat demand

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 8 –

Single boiler, System control, Outdoor reset

Job I

Set the parameters used by the Lead/Lag system

Job L

Building automation or multiple boiler control thermostat demand

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 9 –

Multiple boiler, System control, Outdoor reset

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Touch Screens that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job L

Building automation or multiple boiler control thermostat demand

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

System 10 –

Multiple boiler, System control, Outdoor reset

Job B

Set up the names for each of the controllers

Job C

Make one control the Lead/Lag master

Job D

On each of the controllers that will act as a slave, disable the Lead/Lag Master

Job E

Set up the Modbus control addressing to assign addresses for each of the controls

Job F

Set up the addresses for the flap valves

Job G

Disconnect the Touch Screens that will not be used

Job H

Connect the Modbus wiring

Job I

Set the parameters used by the Lead/Lag system

Job L

Building automation or multiple boiler control thermostat demand

Job K

Lead/Lag outdoor reset and warm weather shutdown

Job O

Set up the combustion on each of the burners

Job P

Set the date and time on the system

Advertising