VACUUBRAND MZ 2C EX +IK+EK User Manual

Page 41

Advertising
background image

page 41 of 75

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check carefully

the validity of this document with respect to his product. manual-no.: 999128 / 29/04/2014

Measure the pressure at the inlet port of the individual

head: Use a suitable vacuum gauge (e. g. DVR 2, cat.

no.: 682902), make sure that it is correctly calibrated, and

measure the pressure at the inlet port. A vacuum of less

than 120 mbar should be indicated.

If the reading is higher, recheck the pump chamber and

make sure that the valves and the diaphragms are cor-

rectly seated (diaphragms concentric with bore).

Screw housing plate to pump.

Position pump on pump feet.

Connect hose to elbow fitting.

Tighten union nuts first by hand and then tighten one full

turn using open ended wrench.

Position the pump on the motor.

Attach hose to the inert gas connection and screw the

locking plate.

Use open-ended wrench to screw the inert gas fitting at

the housing cover.

Individual performance check of a pump head

Assembling fittings

Advertising
This manual is related to the following products: