Start-up check sheet for 90+ furnace – Sears 9MPD User Manual

Page 3

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

START-UP CHECK SHEET

For 90+ Furnace

(Keep this page for future reference)

Dealer Name:_

Address:______

City, State(Province), Zip or Postal Code:_

Phone:

Owner Name:

Address:_____

City, State(Province), Zip or Postal Code:_

Model Number:__________________________

Serial Number:___________________________

Type of Gas:

Natural:

Q LP: Q

Which blower speed tap is used?

(Heating)___________(Cooling)___

Temperature of Supply Air:

Temperature of Return Air:

(+).

(+)_

_or(X)_

_or(°C)_

Rise (Supply Temp.-Return Temp.): (°F)_______or(°C)_

Filter Type and Size:____________________________

Fan "Time ON" Setting:_

Fan "Time OFF" Setting:,

Dealer Comments:

Business Card Here

Manual Gas Shut-Off Upstream

of Furnace/Drip-Leg?

YES

NO

Condensate Drain Connected? YES □ NO □

Condensate

Drain

Trapped?

YES

NO

Transition Pressure switch hose relocated for U/D/H

Application? YES □ NO □

Blower Speed Checked? YES □ NO □

All Electrical Connections Tight? YES □ NO □

Gas Valve OK? YES □ NO □

Measured Line Pressure When Firing Unit:_______________

Calculated

Firing

Rate:(See

Checks

andAdjustmentsSec-

tion).______________________________________________

Temperature Rise (supply-return temperature):(°F)__________

Measured Manifold Gas Pressure:______________________

Static Pressure (Ducts): Supply Air_

Date of Start-Up:_________________

CO? ___________________________

C 0 2 ? _________________________

Return

44001

1114

00

a

Advertising
This manual is related to the following products: