one side of furnace, require a standoff filter rack, see

Figure 36,

available from your distributor.

CAUTION

If

filters

are

only

suitable

for

heating

application,

advise

homeowner that filter size may need to be increased if air

conditioning is added.

Additjon Of Air Conditioning

When a refrigeration coil is used in conjunction with this unit, it
must be installed on the discharge side of the unit to avoid con­
densation on the heat exchanger. The coil installation instructions
must be consulted for proper coil location and installation proce­
dures. With a parallel flow arrangement, dampers must be
installed to prevent chilled air from entering the furnace. If manu­
ally operated dampers are used, they must be equipped with a
means to prevent operation of either unit unless the clamper is in
full heat or full cool position.

A3" clearance is required on the right side of the furnace in order
to run the condensate drain line. Copper, iron or plastic tubing
may be used for the condensate drain line.

Downflow Furnace Installation

Non-Combustible Floor Installation

Fabricate a plenum to the dimensions given in

Table 8,

for the fur­

nace outlet. Plenum should be flanged, approximately ^/

4

" for

support.

Note: The three{3) screws in the top panel of the furnace next to

the duct flange MUST be removed to provide serviceability of the
primary heat exchangers in the downflow installation

1. Position plenum through the floor and set the furnace over

the opening in the floor. If necessary, grout around the base
to seal air leaks between the base and the floor.

Combustible Floor Installation

FIRE HAZARD

Failure to install unit on noncombustible subbase can

result

in

death,

personal

injury

and/or

property

damage.

Place

furnace

on

noncombustible

subbase

on

downflow

applications,

unless

installing

on

non-com­

bustible flooring.

Subbase for Combustible Floor

NOTE

: The three(3) screws in the top panel of the furnace next to

the duct flange MUST be removed to provide serviceability of the
primary heat exchangers in the downflow installation

Note: When using the subbase for combustible floors, the dis­

charge air duct flanges on the furnace MUST be broken down to
provide proper fit up to the subbase. Use duct pliers to bend the
duct flanges flat onto the furnace casing. DO NOT bend the duct
flanges inward (toward the heat exchangers) as air flow restric­
tions may occur.

The Subbase for Combustible Floors

MUST

be used when a

downflow furnace is set on a combustible floor, even when the fur­
nace is installed on a coil box.

1. Cut the opening in the floor according to

Table

8

. The hole

in the floor must be cut to the dimensions listed in

Table

8

since the base is equipped with locating tabs that center the
base over the opening.

The opening in the base is IV

4

" shorter and iVs " narrower than

the recommended size of the opening in the floor. This is done to
maintain clearance between the floor and the plenum.

2.

Fabricate the plenum to the dimensions given in

Table 8.

Note that the dimensions given are outside dimensions.