Vertical termination is preferred. Field supplied pipe and fittings
are required to complete the installation.

Figurn 44

Kit Components

Kit Contents;

3" Rain Cap or 2" Rain Cap

3" Diameter SDR-26 Pipe,

19

^/

2

“ Long or

4" Diameter SDR-26 Pipe,

37^Is"

Long,

2" Diameter SDR-26 Pipe, 31%" Long or

2

V

2

” Diameter SDR-26 Pipe, 24" Long,

3" Y Concentric Fitting or 2" Y Concentric Fitting

3" or 4” Dia.

/ SDR-26 Pipe

l3i,,

2" or 3" Dia.
Y Concentric Fitting

2 or 2^/2" Dia.
SDR-26 Pipe

2" or 3" Dia.

Rain Cap

25-22-03

Vertical & Horizontal Termination

1

.

Determine the pipe diameters required for the installation

from Table 10 and Table 11 and Figure 46.

2.

Determine the best location for the termination kit. See

Figure 45 for vertical termination or Figure 45 and
Figure 49 for horizontal termination. Roof termination is
preferred since it is less susceptible to damage, has re­

duced intake contaminants and less visible vent vapor. For
side wall termination, consideration should be given to: 1)

possible damage from the vapors to plants/shrubs, other

equipment and building materials, 2) possible damage to
the terminal from foreign objects, 3) wind effects that may
cause recirculation of flue products, debris or light snow
and 4) visible vent vapor.

3.

Cut one 5 ' diameter hole through the structure for the

NAHA001CV Kit or one 4" diameter hole for the
NAHA002CV Kit .

4. Dimension D may be lengthened to 60" max. or shortened

by cutting the pipes to 12" min. Dimension A will change ac­

cording to D dimension. (See Figure 46)

Figuro 46

Concentric

Vent

Dimensional

Drawing

EPVC

25-22-03

Model

A*

B

c

D”

NAHA001CV

WTe

3

4

T

2

21 Ve

NAHA002CV

33-^/g

2

3'/2

16'/e

* =

Dimension will change accordingly as dimension D is

lengthened or shortened.

*•

= Dimension D may be lengthened to 60” may also be

shortened by cutting the pipes provided in the kit to 12"
minimum

Table 10

Concentric Termination Kit

NAHA001CV & NAHA002CV Venting

Table for *9MPD Models

50,000, 75,000 & 80,000 Btuh Furnaces

NAHA002CV - 35' & (4) 90° elbows with 2" PVC pipe or
NAHA001CV - 65' & (4) 90° elbows with 3” PVC pipe

100,000 Btuh Furnace

NAHA001CV - 35' & (4) 90° elbows with 3" PVC pipe or
NAHA001CV - 65' & (4) 90° elbows with 3” PVC pipe &
Long Vent Kit (See Tech. Manual)

125,000 Btuh Furnace

NAHA001CV - 35' & (4) 90° elbows with 3" PVC pipe

1. Do not include the field supplied 45° elbow in the total elbow

count.

2. If more than four elbows are required, reduce the length of

both the inlet and the exhaust pipes five feet for each

additional elbow used.

3. Elbows are DWV long radius type for

2"

and 3" vents.

NOTE: Feet of pipe is whichever pipe run is the longest, either
inlet or outlet side.

44001 1114 00

[