Sears 9MPD User Manual

Page 47

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

8

.

Install the rain cap and the small diameter pipe assembly in

the Y concentricfittingand the large pipe assembly. Ensure
that the small diameter pipe is bottomed out and securely

cemented in the Y concentric fitting.

9. Cement the furnace combustion air and vent pipes to the

concentric vent termination assembly. See

Figure 45

or

Figure 49

for proper pipe attachment.

10. Operate the furnace through one heat cycle to ensure com­

bustion air and vent pipes are properly connected to the
concentric termination connections.

44001 1114 00

[

47

)

Advertising
This manual is related to the following products: