Sears 9MPD User Manual

Page 46

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

TciblH 11

Concentric Termination Kit

NAHA001CV & NAHA002CV Venting

Table for N9MP2 Models

50,000 & 80,000 Btuh Furnaces

NAHA002CV - 35' & (4) 90° elbows with 2” PVC pipe or
NAHA001CV - 65' & (4) 90° elbows with 3” PVC pipe

75,000 Btuh Furnaces

NAHA002CV - 20' & (2) 90° elbows with 2" PVC pipe or
NAHA002CV - 35' & (4) 90° elbows with 2" PVC pipe &
Long Vent Kit (See Tech. Manual) or
NAHA001CV - 65' & (4) 90° elbows with 3" PVC pipe

100,000 Btuh Furnace

NAHA001CV - 35' & (4) 90° elbows with 3" PVC pipe or
NAHA001CV - 65' & (4) 90° elbows with 3" PVC pipe &
Long Vent Kit (See Tech. Manual)

125,000 Btuh Furnace

NAHA001CV - 35' & (4) 90° elbows with 3" PVC pipe

1. Do not include the field supplied 45° elbow in the total elbow

count.

2. If more than four elbows are required, reduce the length of
both the inlet and the exhaust pipes five feet for each

additional elbow used.

3. Elbows are DWV long radius type for 2" and 3” vents.

NOTE: Feet of pipe is whichever pipe run is the longest, either
inlet or outlet side.

If assembly needs to be extended to meet height or side wall

thickness requirement, the two pipes supplied in the kit may be
replaced by using the same diameter solid, single (no coupling
connections) field supplied SDR-26 PVC (ASTM D2241) pipes.

Do not extend dimension D more than 60". (See

Figure 46)

Do not use field supplied couplings to extend the pipes.
Airflow restriction will occur and the furnace pressure
switch may cause intermittent operation.

5. Partially assemble the concentric vent termination kit.

Clean and cement the parts using the procedures for Join­
ing Pipe and Fittings section of the manual. A) Cement the
Y Concentric fitting to the 4" diameter kit pipe. (See

Figure 47)

B) Cement the 3" rain cap to the 2 V

2

" diameter

kit part. (See

Figure 47) NOTE:

A field supplied stainless

steel screw may be used to secure the rain cap to the pipe
instead of cementing when field disassembly is desired for
cleaning (See

Figure 47)

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in death,

personal injury and/or property damage.

When using the alternate screw assembly method, drill a
clearance hole in the rain cap and a pilot hole in the vent
pipe for the screw size being used. Failure to drill
adequate

holes

may

cause

cracking

of

the

PVC

components, allowing flue gases to be recirculated.

CARBON MONOXIDE POISONING HAZARD

Failure to follow this warning could result in death,
personal injury and/or property damage.

Do not operate the furnace with the rain cap removed as
recirulation of the flue gases may occur. Water may also
collect inside the larger combustion air pipe and flow to

the burner enclosure.

6

.

Install the Y concentric fitting and the pipe assembly

through the structure's hole. For vertical termination, install
the parts through the field supplied roof boot/flashing.

NOTE:

Do not allow insulation or other materials to accu­

mulate inside the pipe assembly when installing through

the structure's hole.

7.

Secure the assembly to the structure as shown in

Figure 45

or

Figure 49

using field supplied metal strap­

ping or equivalent material.

NOTE:

Ensure the termination height is above the roof sur­

face or anticipated snow level as shown in

Figure 45

for

vertical termination. Ensure the termination location clear­

ance dimensions are as shown in

Figure 48

and

Figure 49

for horizontal termination.

44001 1114 00

Advertising
This manual is related to the following products: