Display Devices Lifts up up 35 lbs User Manual

Page 10

Advertising
background image

IP025-001 V3

IBL Lift Series Installation

07/05

Thor/Sales Info/Installation Materials/IBL Lift

10

7.)

Be sure the lift is centered left-to-right, then tighten the mounting bracket

hardware.

8.)

If you are using the plenum enclosure, adjust the height by loosening the (4)
Philips Head Screws, slide the enclosure box to the proper vertical height, and

retighten.


9.)

Raise the enclosure up into and through the ceiling hole. While holding the

enclosure, insert power, signal, and control cables through the access hole you
just made and affix the flex conduit with strain relief/cable clamps. Slide the

enclosure into position and reinstall the (8) bolts to securely hold the enclosure

to the lift.

10.) Install the strain relief/cable clamps in the panels that are knocked out.

• It may be convenient to put the cables through at this time, depending upon the

ceiling’s finish and accessibility.

• Accessibility should not be a problem in a drop-tile ceiling.

• If it is a finished sheetrock or other solid material, you may need to feed the cables

through the cable holes before you reinstall the enclosure.

Advertising