Display Devices Lifts up up 35 lbs User Manual

Page 15

Advertising
background image

IP025-001 V3

IBL Lift Series Installation

07/05

Thor/Sales Info/Installation Materials/IBL Lift

15

Ceiling Closure

1.)

If you are using a 2424 model, attach the CTB Sliders to the front and rear of the

lower lift frame. Use ¼-20 hex head bolts, flat washer, split washer and nut.
Do not tighten.


2.)

Attach the left and right CTB Brackets to the CTB Sliders using ¼-20 hex head

bolts, flat washer, split washer and nut. Do not tighten.


3.)

Determine the length of the threaded rod and cut to length needed. Be sure to

leave the rod long enough to have an airspace between the projector and the
closure panel.

4.)

Use the enclosed closure rods. Remove the nylock ¼”-20 nut, washer, spring
and plastic grommet.


5.)

Insert the threaded rod into the closure panel mounting points.

6.)

Slide the plastic grommet and spring on the threaded rod from the underside of
the threaded rod. Add the washer and compress spring. Replace the ¼”-20

nylock nut and tighten. Do not overtighten.

7.)

Insert the ceiling material inside the frame. NOTE: Depending upon the finished
ceiling, you may insert a 3/8” board into the closure frame as a backer board for

the finish material to attach to the underside of the closure frame.


8.)

Raise the closure panel to the projector and insert the threaded rods into the 4

mounting points on the lift.

Advertising