PHYSICAL INSTALLATION

TOP-MOUNTING

1.)

Plenum installations

- attach the plenum enclosure to the 8 studs on the lift’s

upper frame. Add flat washer, split lock washer and 7/16” nuts – tighten.

2.)

Before you begin, be sure the threaded rods have a nut and split washer above
the lift frame, and a flat washer and nut below the frame. These can be

temporarily held in place with tape or chewing gum.

3.)

Raise the lift into position and add hardware. Follow the hardware order below

to ensure stability and accuracy when leveling the lift.

Note:

The following are some of the most important steps in proper lift

installation! Use a torpedo or bubble level to level the top frame of the lift. You may

want to use more than one.

1. Level the lift from the right-front to the left-front.

2. Level the lift from left-front to left-rear.
3. Level the lift from left-rear to right-rear.

4. Recheck.
5. Tighten all hardware.

4.)

If you are using the plenum enclosure, adjust the height by loosening the (4)

Philips Head Screws, slide the enclosure box to the proper vertical height, and

retighten.

5.)

Determine the best location for power, control and signal cables to enter the lift
enclosure. Use a knockout tool or drill holes in the enclosure for cables. We

recommend using flex conduit to the enclosure.