Control settings – Display Devices Lifts up up 35 lbs User Manual

Page 5

Advertising
background image

IP025-001 V3

IBL Lift Series Installation

07/05

Thor/Sales Info/Installation Materials/IBL Lift

5

CONTROL SETTINGS

Prior to the physical installation, you must perform the following steps:

1. Be sure that there is no power attached when setting the DIP switches.

2. Set the DIP switches on the control box before you install the lift in the ceiling.

Refer to the chart below for proper configurations.

3. Dip switches are located under the small access panel on the Control Box

attached to the lift frame. Use a 1/16” hex drive to open.

4. Set the 12-volt trigger and AC Trigger based on your system design.

ON OFF

SW1

Aux AC Trigger (see SW2 below)

Aux AC Trigger is on all the time

SW2

Aux AC Trigger upon going down

Aux AC Trigger at show position

SW3

12V out turns off upon going up

12V out turns off at top position

SW4

12V out turns on upon going down 12V out turns on at show position

NOTE: Dip Switch SW1: configuration only works in automatic mode.

1 2 3 4

OFF

ON

Edge of Control Box

AC Configuration

DIP Switches

Advertising