PHYSICAL INSTALLATION

TOP-MOUNTING


Top mounting is typically used when installing the lift into a false ceiling (grid tile) or an

exposed unfinished ceiling.


We recommend you install mounting hardware into a structural channel.

Example – Top Mounting

Structural channel provides flexibility for adjusting the lift front-to-rear and side-to-side.


• All hardware should be at least in 3/8” (M10) diameter.

• You should use angled stabilizers if threaded rods extend 2’ (60 cm) or more

between structural channel and the lift.

• You should also leave the threaded rods slightly loose to ease in alignment and

leveling after installing the lift.

• You need to make sure all hardware is securely tightened at the end of your

installation.