6 installation preparation – Glow-worm Betacom C User Manual

Page 16

Advertising
background image

16

14339

14594

6.1 Appliance Pack

Please check the contents of the carton:

Appliance, Isolation Valves, Wall Hanging Bracket,

Wall Template, Service Installation and User Manual,

Guarantee Card and Benchmark Log Book, see diagram 6.1.

(Literature and appliance not illustrated)

Handling

IMPORTANT: With regards to the Manual Handling

Operations, 1992 Regulations, the following lift operation

exceeds the recommended weight for a one man lift, refer to

section 17 Manual Handling.

To remove the appliance, refer to diagram 6.2.

1. Carefully slit or remove the sealing tape being

careful not to scratch the appliance door.

2. Fully open the carton lid and remove any instructions

and components.

3. Read the instructions carefully before installation of

the appliance.

4. Roll the carton onto its open face.

5. Lift the carton free of the inner packaging.

6. Remove the mounting bracket and valve package.

6 Installation Preparation

Diagram 6.1

Diagram 6.2

7. Stand the boiler on its base within the expanded

polystyrene block and remove the top packaging piece.

8. If you wish to remove the expanded polystyrene base lie

the appliance on its back to do so.

6.2 Site Requirements

The boiler mounting wall should be suitable for the weight of

the appliance and be true and flat.

NOTE: Due to the varied site conditions we do not supply

fixings and advise that the installer should supply those which

are suitable.

CHECK IF 230V thermostat plug is

required to fit to PCB board.

WALL HANGING

BRACKET

CONDENSATE

OUTLET PIPE

COLD WATER

FILTER

C.H. ISOLATION

VALVE FLOW

SEALING

WASHERS

(5 OFF)

C.H. ISOLATION

VALVE RETURN

1

2

5

4

3

COLD WATER

ISOLATION VALVE INLET

D.H.W

OUTLET

SAFETY

DISCHARGE

PIPE

WALL

TEMPLATE

GAS ISOLATION VALVE

Advertising