11.7 Boiler Adjustments

The boiler incorporates 4 potentiometers and a bank of dip

switches to allow adjustment to its pre-set parameters. These

are situated on the rear of the control panel.

The potentiometers can easily be accessed by removing

the cover on the rear of control panel. However, to reach the

dip switches, the control panel must be opened, see diagram

10.4.

Setting the maximum CH heating flow temperature: The boiler

is dispatched with a maximum flow temperature factory set to

85°C. Where a lower maximum temperature is required such

as in the case of under-floor heating, the factory setting can

be altered between a maximum of 50°C and a minimum of

30ºC, by fitting dip switch ‘6’ into “ON” position, see diagram

11.11.

Setting the boiler’s integral pump: The boiler’s integral pump

is factory set to operate in both C.H. and D.H.W. mode.

Where an external pump is incorporated into the system

design the integral pump may be disconnected in C.H. mode

by fitting dip switch ‘5’ into the “ON” position, see diagram

11.11.

Setting the 45 seconds delay: The boiler is factory set to

exclude the delay of 45 seconds before re-ignition between

the closing of a hot water tap and CH start-up. This delay can

be set to 45 seconds by setting dip switch ‘3’ into the “OFF”

position’, see diagram 11.10 and 11.11.

255 seconds delay setting: The boiler is capable of up to 255

seconds ignition delay (anti cycling time) before re-ignition

following burner shut down on the primary hydraulic water

reaching its set temperature. This delay can be increased up

to a maximum of 255 seconds by turning potentiometer ‘P5’

clockwise, see diagram 11.12.

Pump working mode setting: The boiler has a factory set to

operate the pump for pre-purge and post-purge times (45

secs). This delay can be excluded by fitting dipswitch ‘2’ into

“ON” position, see diagram 11.10 and 11.11. However, this may

then cause the boiler over-heat thermostat to trip out.

Setting the Heating output: The Betacom 24c and 30c boilers

are factory set to give maximum CH heating output. The

maximum heat output for heating is pre-set on ‘P2’

potentiometer, see diagram 11.12.The adjustment for max CH

has no effect on max. DHW capacity of the boiler.Ignition

capacity can be increased /decreased by turning ‘P4’

potentiometer clockwise / counter-clockwise. Boiler type is

pre-set on Dip Switch ‘8’ “OFF” position denotes 24 kW,

and `ON` position denotes 28 kW.

Dipswitch 1 and 7 must always be in the “OFF” position.

Dipswitch 4 must always be in the “OFF” position.

Potentiometer 7: No adjustment required.

11 Commissioning

14553

14565

14555

14554

Diagram 11.9

Diagram 11.11

Diagram 11.10

Diagram 11.12