11 commissioning, 3 control panel functions, diagram 11.4, 3 commissioning – Glow-worm Betacom C User Manual

Page 39: 4 initial lighting, Diagram 11.4

Advertising
background image

39

1

2

3

4

bar

0

1

0

22

21

20

19

18

17

16

15

14

13

12

11

10

9

8

7

6

5

4

3

2

1

24

23

ON

30

40

50

60

70

80

90

bar

11 Commissioning

11.3 Control Panel Functions, diagram 11.4.

Central heating and domestic hot water temperature

controls: The boiler’s integral control unit monitors and

adjusts both the boiler’s hydraulic circuit and D.H.W. water

outlet temperatures by means of sensors located on the

CH heating and D.H.W. flow outlets. The sensors electrical

resistance, which is dependant on temperature, determines

the current passing through the control potentiometers

located on the control panel. The respective potentiometer

control dial allows manual setting of the maximum required

temperature (reference value) being between 30º and 85ºC

for CH heating and 35º and 64ºC for D.H.W. When the boiler

operates in heating or D.H.W. mode, the current received is

compared to the manually set reference value. The difference

of the two values operates the modulation of the gas valve

adjusting the useful heat output generated and stabilising the

temperature to within ±1ºC.

Re-set function: Should the boiler lock out at any time,

please check the gas supply and ionisation probe position, the

boiler may be re-started by switching to standby “O” position

waiting 15-30 seconds.

Switching back to its previous position once the fault has been

eliminated.

Function switch: The three position switch allows the boilers

operation to be set to ‘Stand-by’ (centre position), ‘Heating

+ D.H.W.’ (left hand position) or ‘D.H.W. only’ (right hand

position).

14333

Diagram 11.4

11.3 Commissioning

The Betacom 24c and 30c boilers have been tested and pre-

set at the factory and is dispatched with its on board controls

set to provide a maximum central heating and D.H.W. output.

Consequently, once all the connections have been made and

the boiler has been filled with water to the designed system

operating pressure, the boiler may be fired prior to adjusting

it’s on board parameters to match the heating systems

requirements.

11.4 Initial Lighting

Prior to firing: Check that the electrical supply to the boiler

is ‘On’ (The green boiler ‘Stand by’ indicator will light) and the

gas service isolation valve is in the open position, see diagram

11.1.

Set the boiler’s central heating and domestic hot water

temperature controls to maximum by turning them fully

clockwise.

Set the external room thermostat (if fitted) to maximum and

open the thermostatic radiator valves to maximum.

Switch the boilers function switch to the central heating and

domestic hot water position. The boiler’s control unit will

now automatically carry out pre-ignition safety checks before

igniting the burner.

TIMER

DISPLAY

STANDBY

INDICATOR

PRESSURE GAUGE

FUNCTION

SWITCH

CENTRAL HEATING

TEMPERATURE

CONTROL

DOMESTIC HOT WATER

TEMPERATURE

CONTROL

Advertising