Installation – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 13

Advertising
background image

0020096317_01 - 08/10 - Glow-worm

- 11 -

INSTALLATION

5.1.3

Removal of condensate

When the heat pump is operational, it will produce condensation

that needs to be drained off.

1

2

3

A

1

3

2

B

Key

A Configuration with inclination to the left

B Configuration with inclination to the right

1 Heat pump

2 Plug

3 Drainage elbow

• Insert the drainage elbow (3) and pipe into the correct

opening depending on the angle of the heat pump.

• Seal off the other opening with the supplied plug (2).

5.2

boiler circuit

5.2.1

Connection from the hydraulic module to

the boiler

i

Make the connection limiting the load losses to a

minimum (the circuit should be as short as possible,

avoid bends and narrow sections...).

i

Refer to the installation manual delivered with the

boiler for domestic hot water system connections.

1

2

4

3

5

Key

1 boiler

2 Return tubing leading to the boiler (not included))

3 flow boiler tubing (not included)

4 flow boiler connection (Ø ¾")

5 Return boiler connection (Ø ¾")

• Connect a pipe (2) to the return connection (5) leading to the

boiler.

• Connect a pipe (3) to the flow connection (4) leading away

from the boiler.

• Refer to the boiler instructions to connect the pipes (2) and

(3) to the boiler.

5.2.2

Connection of the domestic hot water

cylinder (option)

• Refer to the instructions supplied with the 2-way valve

and the domestic hot water cylinder for their hydraulic

connections to the boiler circuit.

Advertising