Installation – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 30

Advertising
background image

0020096317_01 - 08/10 - Glow-worm

- 28 -

INSTALLATION

• Using a flat wrench (2), open the trap (1) a ¼ turn in order to

remove the air present in the glycol circuit, then close it quickly

(in order to avoid emptying the circuit).

The venting process is carried out for 15 minutes.

• Repeat this last operation at the end of the venting procedure.

• Press the button

.

b

The venting may result in a drop in the glycol

circuit pressure.

• Ensure that the glycol circuit pressure is between 1.5 and

2bars. If it not, top up the glycol circuit.

b

When venting is complete, make sure that the

various heating circuit air vent are open.

12.8.5

Adjustment of HP circuit flow

The heat pump is designed to operate with a minimum flow of

750 l / h. If the flow is less than 500 l / h, the heat pump will stop

and the boiler will begin to function. Heating comfort will always

be guaranteed, but energy saving will be compromised.

The heat pump is equipped with a flow sensor and it is possible

to read the water flow directly via the control unit.

i

The HP circuit flow should be between 750 and 850 l / h.

i

Incorrect venting of the installation may lead to

variations in flow.

• Using the buttons

,

select

HP circuit flow on the screen.

• Press the button

to confirm.

• Using the button

, launch the

reading of the heat pump circuit flow.

1

Key

1 flow control valve

• Use the control valve (1) to adjust the flow of the HP circuit to

between 750 and 850 l/h.

i

If you are unable to obtain a flow of between 750 and

850l/h using the flow control valve (1), change the

speed of the hydraulic pump module.

• Press the button

to stop the flow reading via the

control unit.

• Press the button

.

2

3

1

Key

1 Speed control

2 Speed I

3 Speed II (not applicable to this system)

Advertising