Installation, 12 activating the control unit – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 20

Advertising
background image

0020096317_01 - 08/10 - Glow-worm

- 18 -

INSTALLATION

12 Activating the control unit

a

Ensure that the heat pump and heating circuits

have been filled.

e

Ensure that all the electrical connections have

been made.

• Switch ON the circuit breaker which is located on the

electrical panel and connected to the control unit.

1

Key

1 Switch On (I) / Off (O)

• Turn on the control unit (1) with the switch (2) in position (I).

When connected for the first time, the installation menu is

displayed.

• Use the buttons

to select

a language.

• Press the button

to confirm.

• Enter the installer access code 96

with the buttons

.

• Press the button

to confirm.

12.1 Configuring the installation

• Follow and confirm the steps

prompted by the initial installation

aid.

• Press the button

to confirm.

Your system corresponds to diagram

number "10" in the control unit.

• Choose diagram number "10" with

the buttons

.

• Press the button

to confirm.

Multizone kit' refers to zone valves for

more than one heating zone.

• If so, choose "YES".

• Use the button

to confirm and

follow the control unit instructions.

• If this is not the case and the

installation has only one zone, choose

"NO" with the buttons

.

• Press the button

to confirm.

This screen is only displayed if you

answered “YES” to the previous

question.

• Select number of heating zones

present on the system using the

buttons

.

- Z20 kit = 2 heating zones

- Z11 kit = not available

- Z30 kit = 3 heating zones

• Press the button

to confirm.

• Using the buttons

,

select

DHW cylinder on the screen,

if the option is installed.

• Press the button

to confirm.

Advertising