Installation – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 19

Advertising
background image

0020096317_01 - 08/10 - Glow-worm

- 17 -

INSTALLATION

i

The level of glycol may decrease during the

first month following the commissioning of the

installation. It may also vary in accordance with the

outdoor temperature.

Any residue of glycol solution should be kept in an appropriate

container to be re-used for the next filling.

• Ensure any leftover glycol solution is left with the end user

and retained in a safe place.

8 filling the heating circuit

i

In the case of a multi-zone installation, fill the heating

circuit using the “Filling” mode when commissioning

the control box. “Filling” mode ensures filling by

automatically opening all of the circuit. Refer to the

chapter “Commissioning the

Systempro control unit

► Commissioning ► Filling the heating circuit".

• For single zone installations (diagram 9.1), please refer to

your boiler installation manual for filling of the heating circuit.

• For mutiple zone installations (diagram 9.2, 9.3) please refer

to chapter "Commissioning ► Filling the heating circuit" for

instructions on configuring the systempro control box for

filling multiple zones.

9 Activating the heat pump

1

Key

1 ON/Off button

• Switch ON the circuit breaker which is located on the

electrical panel and connected to the heat pump.

• Switch ON the heat pump button (1). Check that the green

LED located on the heat pump’s motherboard is on.

i

To locate the LEDs on the PCB, see the "Wiring

diagram" chapter in the heat pump instructions.

10 Activating the boiler

• Refer to the boiler instructions in order to adjust the boiler.

b

Ensure that the maximum heating temperature is

compatible with the installation.

b

Make sure the boiler pump is not in permanent

mode.

11 Activating the room thermostat

1

2

3

Key

1 battery cover

2 Protective cover

3 Room thermostat

• Remove the protective cover (2) located in the battery

compartment following the order (A) to (C).

• The main screen of the room thermostat is displayed.

Advertising