Installation – Glow-worm Clearly Hybrid - Back-up Module System User Manual

Page 15

Advertising
background image

0020096317_01 - 08/10 - Glow-worm

- 13 -

INSTALLATION

6.2

electrical wiring

e

Insert the Ebus 24V cable and 230V power cable

in different casings.

B

A

5

4

3

2

1

6

Key

1 230 V supply connection terminal block

2 ebus connection terminal

3 Clamp for ebus cable

4 Clamp for 230 V power cable

5 Access hatch to electrical connections

6 Access hatch screw

• Remove the screw (6) from the access hatch (5).

• Open the access hatch (5).

Ebus Connection

• Connect a 2 x 0.75 mm ² cable to the heat pump’s BUS

terminal (2).

• Pass the cable through the cable clamp (3).

• Connect the Ebus cable to the

Systempro control unit.

• Tighten the clamp.

230V Connection

• Connect a 3 x 2.5 mm ² cable to the heat pump’s power

terminal 230V (1).

• Pass the cable through the cable clamp (4).

• Connect the heat pump’s power cable to the installation’s

electrical panel: single-phase network 230V + neutral + earth.

• Close the access hatch with the screw (6).

• Tighten the clamp.

6.3

Hydraulic module

1

Key

1 ebUS connector

Ebus terminal

• Connect a 2 x 0.75 mm ² cable to the hydraulic module’s

BUS terminal (2).

• Connect the Ebus cable to the

Systempro control unit.

230V Connection

• Connect the heat pump’s power cable to the installation’s

electrical panel: single-phase network 230V + neutral + earth.

6.4

boiler

• Consult the installation manual supplied with the boiler in

order to connect the boiler to the electricity circuit.

Advertising